• Sustain calculate the feasibility of installing solar PV panels for Bristol City Council

    10/10/2011

    Bristol City Council will be funding the installation of solar photovoltaic (PV) panels on schools under their control. Sustain was appointed to carry out studies at each school that expressed an interest in the scheme. These covered all aspects related to the feasibility of installing solar PV panels at each school. So far 20 schools have been surveyed and the reports will be used to tender for installation contracts to PV installers.

    Read more

  • Sustain is working with Bilfinger Berger to reduce utilities consumption

    06/10/2011

    Sustain is working with Bilfinger Berger to manage the electricity, gas and water utilities at two large PFI schools in Bedford on a 5 year contract. Sustain was selected due to its focus on achieving a real reduction in the utility consumption and costs and has already achieved double digit percentage savings. It has achieved this rapidly through gaining a detailed understanding of the energy usage in the schools and drawing up a practical Carbon Management Action Plan which it is delivering too.

    Read more